Projects Completed
Alang, Bhavnagar (Gujarat)
Gujarat Maritime Board
STARTING DATE 31.07.1995
COMPLETION DATE 30.10.1996
LENGTH & SPAN OF
248.00m, Span 18 m : 12 nos.
BRIDGE
SIZE OF BRIDGE
225.00m x 8 m
STRUCTURAL DETAILS
(a) Foundation 1200 mm dia bore piles.
Depth of pile : 20.00 m.
(b) Substructure 1.20 m. dia, Two circular R.C.C. piers in
M30 grade concrete with pier cap at
top.
( c) Superstructure Simply supported 4 girder system
beams with deck slab at top
supported on pier cap.
SPECIAL FEATURES This was unique bridge constructed in
river floor and sea tidal attected area.