Projects Completed
a/c river Sabarmati near Motera Stadium at
Ahmedabad.
Ahmedabad Municipal Corporation
STARTING DATE 09.03.1998
COMPLETION DATE 30.06.2001
SIZE OF BRIDGE 40m. length - 19 Spans.
STRUCTURAL DETAILS
(a) Foundation 80 Nos. of 1200 mm dia. 21m Deep R.C.C.
bored piles.
(b) Substructure Two circular columns with column cap at
top.
( c) Superstructure 40m Long open web fabricated steel
girder.
(d) Carriage Way 4.50 m wide
SPECIAL FEATURES 16 span of super structure are launched
from one end, Radio graphically tested
welding is adopted.